1、檢測固定升降機http://www.qdysj.net/管子的質量,要查明固定升降機鋼管材料、尺度和質量是不是符合規(guī)劃規(guī)則;查看固定升降機管子外觀是不是有嚴重壓扁或曲折,查看固定升降機管子內外壁表面上是不是有腐蝕表象,外壁是不是有裂紋等缺點。
Quality testing fixed lift tube, to identify a fixed lift steel materials, scale and quality is not consistent with the planning rules; see the fixed lift tube appearance is not a serious crush or tortuous, look at the inner and outer wall surfaces of the pipe is not fixed lift corrosion appearance, the outer wall is not a drawback crack.
2、安裝固定升降機鋼管管道必須按規(guī)劃圖紙或實際測量合理安置,安裝時對固定升降機鋼管接頭、法蘭件都要進行質量檢測,發(fā)現如有缺點,接頭、法蘭件都禁止運用,應替換,并用火油清潔和用氣吹凈。
Mounting lift steel pipes must be reasonable planning drawings or actual measurement placement of fixed lift pipe fittings, flanges, parts quality testing should be carried out during installation, if any shortcomings found, fittings,flanges, prohibit the use of parts should be replaced with Oil and gas blowing clean.
3、固定升降機http://www.qdysj.net/鋼管安裝時對現已酸洗過的管子要用氣吹凈,對已就位的固定升降機鋼管液壓閥臺、液壓泵站、主機、輔機及有關部件的方位應謹慎丈量、力求精確,對接頭之間曲折部位較多、形狀雜亂的管子要先做一個樣板,然后按尺度或樣板切開管子。
When the pipe is installed on a fixed lift pickled now use gas blow pipe, already in place for fixed steel hydraulic valve lift station, orientation pump stations, main engine and related components should be carefully measured, and strive to accurately of twists and turns between the joint parts are more messy tube shape to do first a model, and then press the scale or template to cut the pipe.